Dan Davids
President The First Public J1772: Another Leap Closer to Plugging In
The first Level 2 public J1772 charging station in the world went operational on Monday, May 3, some 10 miles from Sacramento Airport in Woodside, CA. As readers of this newsletter will know, this is a historic achievement, as J1772 is the universal standard that will charge all the coming new plug-ins in the U.S.
Tom Dowling, charging infrastructure manager with the Electric Auto Assn. and long-time EV driver (12 years!), had the J1772 interface installed. The charger itself, is a ClipperCreek model CS-40 with a 208 volt capacity.
Of course, there are no vehicles for the station to charge at the moment because there are no J1772-capable cars on the road yet. But at press time, Tom expected an early Leaf, slated to visit UC Davis, to visit the charging station for a photo op and a charge in mid-May. In a tantalizingly few months, there should be lots of J1772-capable cars craving a charge at the station.
"This installation of an SAE J1172(tm) charging station is an important milestone" Tom says. "Here we have a fully UL-approved charging station, cable, and connector. Suppliers are ready to provide fully-approved equipment in volume. We're actually ready for vehicles before the vehicles arrive. We don't have the problems the BMW Mini E trial had, where the vehicles arrived before all the approvals were complete, and we have a new universal standard connector, not a vehicle-manufacturer-specific connector. Now all we need are the vehicles."
The J1772 location also boasts the first public Tesla charging station, a ClipperCreek TS-90, installed in '09 as well as legacy charging stations for Toyota's RAV4 EV and Ford's Ranger EV.
No comments:
Post a Comment